Data Room Supporting Project in Hong Kong
Project Requirements
Equipped with UPS host, the dual-loop 2N system is used for power supply, and the lithium battery cabinet is put into the cabinet to the micro-module computer room, providing safe and reliable power guarantee for the data center
Key Results
400A load current, which can be used for 15 minutes, meets the backup time requirements and saves 80% of the space in the computer room.
-
Client Industry
Data room
-
Location
Hong Kong, China
-
Date of Deployment
2024
-
Products Deployed
PU512V100Ah
-
Total Capacity/Scale
20 sets