Data Room Supporting Project in Hong Kong.jpgProject Requirements

Equipped with UPS host, the dual-loop 2N system is used for power supply, and the lithium battery cabinet is put into the cabinet to the micro-module computer room, providing safe and reliable power guarantee for the data center

Key Results

400A load current, which can be used for 15 minutes, meets the backup time requirements and saves 80% of the space in the computer room.

  • Client Industry

    Data room

  • Location

    Hong Kong, China

  • Date of Deployment

    2024

  • Products Deployed

    PU512V100Ah

  • Total Capacity/Scale

    20 sets