Thailand Data Room
Key Results
180KW load current, 0.25 hours of backup power, to meet the backup time requirements. The integrated system has a small installation footprint and high space utilization
-
Client Industry
Data room
-
Location:
Thailand
-
Date of Deployment
2020
-
Products Deployed
SU192V25
-
Total Capacity/Scale
13 groups
Looking for a Reliable Global Energy Partner?
Connect with our global team to design a custom energy solution for your next project.