Electronics Laboratory Instrument and Equipment Power Supply Project in China
Project Requirements
It is equipped with Delta host to provide uninterrupted power supply for laboratory instruments and equipment to ensure power safety
Key Results
The load current of 300A can be used for 15 minutes to meet the backup time requirements
-
Client Industry
Power Management
-
Location
China
-
Date of Deployment
Augest, 2024
-
Products Deployed
PU512V100
-
Total Capacity/Scale
8 sets
Looking for a Reliable Global Energy Partner?
Connect with our global team to design a custom energy solution for your next project.