Thailand Data Center UPS Backup Power Project
Key Results
Delivered 180 kW backup power output for critical data center loads
Provided 15 minutes (0.25 hours) of UPS backup to meet required runtime
Integrated system design minimized installation footprint and maximized space utilization
Reliable lithium battery solution for mission-critical data center backup power
-
Client Industry
Data Center
-
Location
Thailand
-
Date of Deployment
2020
-
Products Deployed
SU192V25 Lithium Battery System | 180 kW Backup Power | 15-Minute Backup Runtime
-
Total Capacity/Scale
13 Units
Looking for a Reliable Global Energy Partner?
Connect with our global team to design a custom energy solution for your next project.